Sunday, April 5, 2009
A coral rock foundation has been fine for the past 50 years. I frequently disagree with Martin Marquez but I believe he performed a public service when he had a remote controlled vehicle go under the building and take pictures of the pilings and general foundation. It is my recollection that his pictures showed the foundation was in excellent shape, and that was reflected in the Pistorino report. The pool had a leak, and the chlorine did some damage to the support beams, etc. there, but it is repairable and WAS included in the LINK contract. Ask Martin Marquez, the local architect, about the results of his community service providing those pictures. Dr. Mel P. Johnson