Sunday, March 8, 2009
commentary
There is a receipt for the rental of the gym for the Iggy Pop commercial Nov 18,19, 20, and 21 for $2500 in the form of two checks, # 4517 and #4518. I am NOT saying Mr Suco is responsible for my signs missing, as I have NO proof of that at this time. I AM saying some of my signs are missing, damaged, and/or knocked down, along with other challenger signs. I find that in my travels around the City that residents are VERY interested in the outrageous sums the City paid for the bathrooms and the CC enclosure. To them, costs are NOT immaterial OR irrelevent. Costs are VERY relevent to them in their daily lives, and in the taxes they pay into the City. Residents are struggling to pay their bills and DONT want additional tax hikes OR their tax monies to disappear from constant change orders and cost overruns. Period. It is a message that makes rational sense to them and it sells itself. I am just the messenger. The only ones who are upset are those that are being exposed for the shady deals and highly questionable expenses. Have a nice day. Dr. Mel P. Johnson
Labels:
bathrooms,
cc enclosure,
Iggy Pop commercial rent
Friday, October 24, 2008
commentary
When an experienced contractor can build the same 2 bathrooms for 140k, and we are paying over 500k for the 2 bathrooms the city has built, then yes, it IS presumed that the additional 360k+ paid was for work that WASNT DONE, since we already KNOW how much it costs to build it. The CC enclosure should have cost no more than 100k, yet we paid 500k, and yes, it is also presumed that additional 400k went for work that WASNT DONE. Sewer hookups on the bathrooms can be done at $8 a linear foot plus the cost of materials. Figure 400 feet tops, that comes to $3200 plus $1800 for materials = $5000. When we pay 38,500 it is assumed that the ADDITIONAL $33,500 was paid for work that WASNT DONE, because we KNOW it doesnt cost anywhere NEAR what we paid to do the actual work. When we pay 33k to elevate the bathrooms that our contractor can do in one day for 5k, we presume that the additional money went for work that wasnt done, because we KNOW it doesnt cost anywhere NEAR what we paid to do the actual work. What other answers could there be? Kickbacks? Fraud? Bid rigging? hard to prove, yet common sense tells us that additional monies went SOMEWHERE, right?
Labels:
bathrooms,
CC,
pay for work not done,
presumptions
Thursday, September 18, 2008
finally
After TWO YEARS in the making, are the bathrooms FINALLY done, and open for business? It will be interesting to see what the final tally will be. These have to be some of the MOST expensive bathrooms in history. Can you imagine what a new GYM would be? Incredible. Absurd. Preposterous. Ridiculously wasteful.
Tuesday, August 5, 2008
desperately seeking sense
Visited the Stafford bathroom today and again found NO water fountains, no mop sink, no flooring, nor any wheelchair accessability; also no means of refrigeration or lighting. DID see the incredibly expensive sewer hookup, piles of rocks supporting the slab that had been washed away, and the VERY attractive barricades. How much are we being charged for the fill and the barricades? Are the barricades permanent? September will be TWO years and still no sign of when we will be able to actually USE them. Scary thought- these are the same guys who are supposed to build a 32,000 foot new gym for us. This is 1116 square feet, TWO years behind schedule, costs over $400 a square foot, SO FAR, and shows NO signs of being finished anytime soon. If you arent scared yet, maybe you should be. The buck stops at Borgemanns desk. How does he explain this, yet another disaster on HIS watch? under HIS supposed direct supervision? (I use the term supervision loosely, for obvious reasons, as there IS no apparent oversight of ANY significance). OVER two years for bathrooms? costs so far an easy triple of the usual and customary costs.. is THIS the best he has to offer? Incredible. Ridiculous. Incompetency personified. Ineptitude on the hoof. Absurd. There HAS to ba another answer for these repeated, costly, and continuous disasters- NOBODY can be THAT stupid all the time! Must be kickbacks, or bid rigging, or something, because no other explanation makes sense. If somebody has an rational explanation for these continuous construction catastrophies I would like to hear it.
Saturday, May 31, 2008
bathrooms and other city fiascos
I went by the bathrooms yesterday and they ARENT open and functioning yet, ten months later. The eletrical meters aren't in and the slopes up to the bathrooms aren't there. I have no real objection to making them wheelchair accessible and I believe they SHOULD be. I OBJECT strongly to paying 3, 4, and more times what it SHOULD cost!! $34,000 sounds like a LOT to me for a couple hundred feet of concrete and some handrails, but I will have my contractor friend look at it for me and run HIS numbers on that job. We are OVER $400,000 on these bathrooms, SO FAR.
Is there ANYBODY in the Springs who has a $200,000+ bathroom? As somebody so astutely pointed out before, you can buy a LOT of HOUSES in the Springs now for 400k !!!! And I believe they will be coming back for MORE MONEY before it is done because there is STILL not water fountains OR a mop sink, as per county regulations. And I wonder who hooked up the electrical and water. More importantly, at what cost was it done?
Its ANOTHER expensive financial abortion from City officials, where WE, the people, have to pay for their incompetence, or worse. WHY would we expect them to do ANY BETTER on a 32,000 foot new gym project????? Its the SAME group of incompetents practicing their incompetency AGAIN with HUNDREDS of THOUSANDS of our hard-earned tax dollars, JUST LIKE BEFORE !!! Since there have been NO changes made in the players (and obviously NOTHING learned) for us to expect anything less than ANOTHER financial BATH would be crazy!!!! STOP the craziness!!!
Well, it looks like yesterday was something to do with their website as today it is running normally. I had never seen that website have that particular problem before so its my bad for thinking it was just me that wasnt able to post yesterday.
Is there ANYBODY in the Springs who has a $200,000+ bathroom? As somebody so astutely pointed out before, you can buy a LOT of HOUSES in the Springs now for 400k !!!! And I believe they will be coming back for MORE MONEY before it is done because there is STILL not water fountains OR a mop sink, as per county regulations. And I wonder who hooked up the electrical and water. More importantly, at what cost was it done?
Its ANOTHER expensive financial abortion from City officials, where WE, the people, have to pay for their incompetence, or worse. WHY would we expect them to do ANY BETTER on a 32,000 foot new gym project????? Its the SAME group of incompetents practicing their incompetency AGAIN with HUNDREDS of THOUSANDS of our hard-earned tax dollars, JUST LIKE BEFORE !!! Since there have been NO changes made in the players (and obviously NOTHING learned) for us to expect anything less than ANOTHER financial BATH would be crazy!!!! STOP the craziness!!!
Well, it looks like yesterday was something to do with their website as today it is running normally. I had never seen that website have that particular problem before so its my bad for thinking it was just me that wasnt able to post yesterday.